Cambium PTP 500 Installation Guide
1. Inventory PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 7 Connectorized ODU additional components Item Notes Antenna One requir
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 8 2. Interface description ODU interfaces The ODU has the following interfaces: Interf
2. Interface description PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 9 PIDU interfaces The PIDU has the following interfaces: Int
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 10 3. Grounding and lightning protection Electro-magnetic discharge (lightning) damage
3. Grounding and lightning protection PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 11 General protection requirements Apply the pra
3. Grounding and lightning protection PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 12 Mast or tower installation For mast or tower
3. Grounding and lightning protection PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 13 Wall installation For wall installations, the
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 14 4. Preparing for installation Safety precautions before installation All national an
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 15 5. Installing the ODU Checks and safety precautions To prevent failure of the assem
5. Installing the ODU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 16 Selecting a position for the ODU (connectorized) Mount a conn
phn-2508_005v000 (Mar 2013) Accuracy While reasonable efforts have been made to assure the accuracy of this document, Cambium Networks assumes no l
5. Installing the ODU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 17 5 Connect the ODU ground cable to the to the grounding system
5. Installing the ODU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 18 4 When dressing the antenna cables, form drip loops near the
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 19 6. Installing the drop cable and LPU Preparing drop cables Main drop cable: To prepa
6. Installing the drop cable and LPU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 20 Check that the crimp tool matches the RJ45 c
6. Installing the drop cable and LPU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 21 Installing and grounding the main drop cable
6. Installing the drop cable and LPU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 22 3 Once the gland is fully hand screwed into th
6. Installing the drop cable and LPU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 23 Making a drop cable ground point To ground the
6. Installing the drop cable and LPU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 24 5 Cut a 38mm (1.5 in) section of self-amalgama
6. Installing the drop cable and LPU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 25 9 Prepare the metal grounding point of the sup
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 26 7. Installing the PIDU Mounting the PIDU Mount the PIDU on a wall or other suitable
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page i Contents About this guide ...
7. Installing the PIDU PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 27 4 Plug in the cable from the LPU (or PTP-SYNC if installed),
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 28 8. Installing an E1 or T1 interface The E1 or T1 cable and the Ethernet cable share
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 29 License keys and regulatory information
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 1 About this guide This guide describes the tasks that must be performed to install the
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 2 Important safety information To prevent loss of life or physical injury, observe the
Important safety information PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 3 Powering down before servicing Always power down and un
PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 4 1. Inventory PTP 500 kit For kit variant part numbers, see the PTP 500 and PTP 300 Se
1. Inventory PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 5 Other standard components In addition to PTP 500 kits, standard install
1. Inventory PTP 500 Installation Guide phn-2508_005v000 (Mar 2013) Page 6 Item Notes Lightning Protection Unit (LPU) kits Two kits are required
Commentaires sur ces manuels