Motorola F5207A, F5217A Guide d'installation Page 13

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 55
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 12
Installation
This section describes the tools and equipment, planning requirements, and product
inspections necessary for a smooth installation of the Mobile Workstation 800 (MW 800).
Proper planning will help to ensure that the installation is completed without difficulty and
that no damage occurs to the units or the vehicle.
Unpacking
Carefully unpack each item from the shipping carton. Check all items for shipping damage,
and make sure you have received all items ordered.
If there is damage or missing items, retain the shipping carton for inspection.
The following parts are used to mount the MW 800:
Mount assembly
CPU box mount kit for the MW 800 CPU V056AQ (optional)
Mobile Workstation MW 800 Vehicle Installation Guide, 68P02967C20
Preparing to Install the MW 800 Inside the Vehicle
Tools
The following tools and service aids are required for installation:
3/8” nut driver
1/2”, 3/8” or 7/16” wrench
No. 2 and 4 Phillips screwdriver
Drill with 3/16” drill bit
Planning
Be sure to consider the following issues when planning the installation:
Keyboard and display location relative to air bag deployment zones
Environmental considerations
Electrical guidelines
Liquid Propane (LP) gas warning
The MW 800 is a reliable product when installed correctly. However,
performance can be seriously impaired if it is not installed correctly.
Thoughtful planning can make the difference.
Please note that installing any part of the MW 800 must be according to
the instructions provided in this manual or by SDI.
!
Caution
!
Warning
Vue de la page 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 54 55

Commentaires sur ces manuels

Pas de commentaire