Motorola AP-650 Series Guide d'installation Page 19

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 46
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 18
Altitude 4600 Series Access Point Installation Guide 19
This placement requires installation of the provided light pipe for viewing the status
lights of the unit.
Suspended Ceiling Mount Hardware
Light pipe
Badge for light pipe
Safety wire (recommended) and security cable (optional)
Ceiling Mount Procedure
To mount the Altitude 4600 Series Access Point on a ceiling:
1 If possible, remove the ceiling tile from its frame and place it, finished side down, on
a work surface.
2 If required, install a safety wire, between 1.5mm (.06in.) and 2.5mm (.10in.) in
diameter, in the ceiling space.
3 If required, install and attach a security cable to the unit’s lock port.
4 Mark a point on the upper or unfinished side of the tile.
5 Push the light pipe through the tile at the mark and remove the light pipe. If
necessary, use a drill to make a hole in the tile.
6 Attach appropriate antennas to the connectors.
Badge
Ceiling Tile
Light Pipe
Vue de la page 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 45 46

Commentaires sur ces manuels

Pas de commentaire